• Miri River Dam
  • Miri River Dam

Miri River Dam

Overview

Miri River Dam is located upstream of the Goshiribetsu River. It is a multi-purpose dam completed in 1991 for the four purposes of flood control, maintenance of the normal functioning of running water, irrigation, and power generation. The Miri River Dam has a 2.4-km fishway, and visitors can freely observe the fish in the fishway as the seasons change through observation windows.
It is also the longest dam in the complex, and running and cycling are also possible at the top of the Admiralty.

Location

Aza Mirihe, Imagane-cho, Setagaya-gun

parking lot

Yes

スポット運営者

函館開発建設部今金河川事務所 美利河ダム管理支所

  1. Top
  2. Spot
  3. Miri River Dam